IHRIS Plan Development: Difference between revisions

From IHRIS Wiki
No edit summary
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
''Development Update – iHRIS Plan - As of March 2008''
''Development Update – iHRIS Plan - As of February 2009''




Line 6: Line 6:
'''Developer''': Luke
'''Developer''': Luke


'''Status''': initial features list ([[Planned Features -- Software]] and [[Planned Features -- Workforce Projection Model]]), requirements and use cases are completed; workshop report has been drafted
'''Status''': Version 1.0.3 released


'''Next milestone''': release version 1.0 by June for pilot testing; this is an initial proof-of-concept version
'''Next milestone''': possible Version 1.0.4 with minor fixes scheduled for release in Summer 2009


=== To-do’s ===
 
* All documentation to be distributed to technical advisory group for feedback
=== High-priority tasks ===
* Open questions about the workforce planning model need to be resolved with technical advisory group (see [[Questions for Discussion]])
 
* Finalize workshop report and submit to RKM team (Carol)
* Support printing of projections
* Arrange intensive consultation with workforce planning export (participant in workshop) on-site to vet features, requirements and use of the model for the software
* Include asterisk to denote required fields
* Hire a user interface designer if there is budget for it
 
* Test software as it is being developed and get feedback from technical advisory group; keep documentation updated with changes
''Note: All other high-priority feature requests have been completed.''
* Write help and user manuals in consultation with technical advisory group
 
 
=== Lower priority tasks ===
 
* Expand the user's manual and add context-sensitive help
* Add ability to import data from other iHRIS systems
* Add more reporting features and ability to export reports
* Support for pre-service training data entry
* Add template for a health workforce implementation plan
 
 
=== Possible development direction ===
 
We may remove iHRIS Plan from the iHRIS suite as a standalone product and make it a module that can be included with iHRIS Manage/Qualify instead.
 
[[Category:Archived Pages]]

Latest revision as of 12:20, 20 November 2013

Development Update – iHRIS Plan - As of February 2009


iHRIS Plan Core

Developer: Luke

Status: Version 1.0.3 released

Next milestone: possible Version 1.0.4 with minor fixes scheduled for release in Summer 2009


High-priority tasks

  • Support printing of projections
  • Include asterisk to denote required fields

Note: All other high-priority feature requests have been completed.


Lower priority tasks

  • Expand the user's manual and add context-sensitive help
  • Add ability to import data from other iHRIS systems
  • Add more reporting features and ability to export reports
  • Support for pre-service training data entry
  • Add template for a health workforce implementation plan


Possible development direction

We may remove iHRIS Plan from the iHRIS suite as a standalone product and make it a module that can be included with iHRIS Manage/Qualify instead.