IHRIS Plan Development: Difference between revisions
From IHRIS Wiki
Sturlington (talk | contribs) |
Sturlington (talk | contribs) (Updated) |
||
Line 6: | Line 6: | ||
'''Developer''': Luke | '''Developer''': Luke | ||
'''Status''': initial features list ([[Planned Features -- Software]] and [[Planned Features -- Workforce Projection Model]]), requirements and use cases are completed; | '''Status''': initial features list ([[Planned Features -- Software]] and [[Planned Features -- Workforce Projection Model]]), requirements and use cases are completed; development is nearly complete | ||
'''Next milestone''': release version 1.0 by | '''Next milestone''': release version 1.0 by mid-July for pilot testing; this is an initial proof-of-concept version | ||
=== To-do’s === | === To-do’s === | ||
* All documentation to be distributed to technical advisory group for feedback | * All documentation to be distributed to technical advisory group for feedback | ||
* Open questions about the workforce planning model need to be resolved with technical advisory group (see [[Questions for Discussion]]) | * Open questions about the workforce planning model need to be resolved with technical advisory group (see [[Questions for Discussion]]) | ||
* Arrange intensive consultation with workforce planning export (participant in workshop) on-site to vet features, requirements and use of the model for the software | * Arrange intensive consultation with workforce planning export (participant in workshop) on-site to vet features, requirements and use of the model for the software | ||
* Hire a user interface designer if there is budget for it | * Hire a user interface designer if there is budget for it | ||
* Test software as it is being developed and get feedback from technical advisory group; keep documentation updated with changes | * Test software as it is being developed and get feedback from technical advisory group; keep documentation updated with changes | ||
* Write help and user manuals in consultation with technical advisory group | * Write help and user manuals in consultation with technical advisory group |
Revision as of 09:47, 1 July 2008
Development Update – iHRIS Plan - As of March 2008
iHRIS Plan Core
Developer: Luke
Status: initial features list (Planned Features -- Software and Planned Features -- Workforce Projection Model), requirements and use cases are completed; development is nearly complete
Next milestone: release version 1.0 by mid-July for pilot testing; this is an initial proof-of-concept version
To-do’s
- All documentation to be distributed to technical advisory group for feedback
- Open questions about the workforce planning model need to be resolved with technical advisory group (see Questions for Discussion)
- Arrange intensive consultation with workforce planning export (participant in workshop) on-site to vet features, requirements and use of the model for the software
- Hire a user interface designer if there is budget for it
- Test software as it is being developed and get feedback from technical advisory group; keep documentation updated with changes
- Write help and user manuals in consultation with technical advisory group